New Jersey ›
Lindenwold › Forever Young Child Care Learning Center
Forever Young Child Care Learning Center
0Compliance score
Poor
Poor
Capacity 194. 0 to 13 Grow NJ Kids: Level 1
Violation history (187)
| Severity | Date | Standard / narrative | Corrected |
|---|---|---|---|
| ? | Tue Aug 19 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(r) — The center shall take any steps required by the Office of Licensing to correct conditions in the building or center that may endanger the health, safety, and well-being of the children served. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(b)(2) — Centers that maintain outside sandboxes or play areas containing sand shall ensure that the sand is maintained in a safe and sanitary manner. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(f)(2) — Toilet facility requirements are as follows: mirrors, dispensers, and other equipment shall be fastened securely. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields. During program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. Parking areas, pedestrian walkways, or other exterior portions of the premises subject to use by center occupants at night shall be illuminated to provide safe entrance to and egress from the center. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields. During program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. Parking areas, pedestrian walkways, or other exterior portions of the premises subject to use by center occupants at night shall be illuminated to provide safe entrance to and egress from the center. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: 1. The building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. 2. The outdoor play area shall be graded or provided with drains to dispose of surface water. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(5) — garbage receptacles shall be: made of durable, leak-proof and nonabsorbent materials; covered in a secure manner; emptied to the outdoor garbage receptacle when filled; maintained in a sanitary manner. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(b) — An applicant seeking a license or a Certificate of Life/Safety Approval to operate a center shall comply with all applicable provisions of the New Jersey Uniform Fire Code, as specified in N.J.A.C. 5:70 and hereinafter referred to as the NJUFC. The center shall obtain the building's fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, reflecting the center's compliance with all applicable provisions of the NJUFC. The center shall maintain on file the building's fire safety inspection certificate. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(1) — The center shall provide sleeping equipment for children 12 months of age and younger, the center shall provide for each child a crib, that complies with the Consumer Product Safety Commission's (CPSC) Federal Safety Standards for Full- Size and Non-Full-Size Baby Cribs; 16 CFR 1219 and 1220, which is incorporated herein by reference, and can be obtained through the CPSC's website at https://www.cpsc.gov/Safety-Education/Safety- Education-Centers/cribs , playpen, or other Office of Licensing-approved sleeping equipment that meets the following requirement that |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.4(a)(2) — For early childhood programs, the following shall apply, all lally columns in areas used by the children shall have protective padding placed around them from the floor to a height of at least 48 inches. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.4(a)(1) — For early childhood programs, the following shall apply, all electrical outlets that are accessible to the children shall have protective covers. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(6) — Outdoor maintenance and sanitation requirements are as follows: centers that provide outdoor space shall maintain all fencing in proper condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Thu Jan 04 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Mon Apr 03 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. |
Yes |
| ? | Mon Apr 03 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Mon Apr 03 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Thu Nov 10 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a)(1) — Topics of orientation training shall include supervising and tracking all children, as specified in N.J.A.C. 3A:52-4.3(a). |
Yes |
| ? | Thu Nov 10 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(1) — The center shall develop and implement an Office of Licensing-approved method to keep track of the location and ensure the safety of all children at all times when under the center’s supervision, including the transfer of supervision from and to parents during arrival and departure and the utilization of off-site locations, including playgrounds and field trips. |
Yes |
| ? | Thu Nov 10 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a) — The children shall be supervised directly by a staff member at all times, including during outdoor activities, rest and sleep, and walking through hallways. Toileting procedures shall be supervised by a staff member as appropriate for the ages and developmental needs of the children. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: the building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: the building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.9(a) — The sponsor, sponsor representative, director, or any staff member shall verbally notify the State Central Registry Hotline (1-877 NJ ABUSE/1-877-652-2873) immediately whenever there is reasonable cause to believe that a child has been subjected to abuse or neglect by a staff member, or any other adult, pursuant to N.J.S.A. 9:6-8.9, 8.10, 8.13 and 8.14. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(r) — The center shall take any steps required by the Office of Licensing to correct conditions in the building or center that may endanger the health, safety, and well-being of the children served. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(n)(1) — Fire prevention requirements are as follows: the center shall conduct fire drills at least once a month, as specified in the NJUFC. The center shall ensure that fire drills are conducted during each session provided at the center and that one fire drill per year is conducted during nap time, if applicable. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(f)(3) — The staff development specified in N.J.A.C. 3A:52-4.8(a) through (d) shall be provided either by the center or by another source such as a college or university, community or professional organization, professional consultant, State agency, or an instructor approved by the Instructor Approval System of Professional Impact of New Jersey. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(l)(4) — Emergency procedure requirements are as follows: the center shall conduct two lockdown drills per year and maintain on file a record of each lockdown drill. The center shall ensure that lockdown drills are conducted during each session provided at the center. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.7(a) — Staff members shall not use hitting, shaking or any other form of corporal punishment of children. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.8(a)(4)(iii) — Handwashing requirements are as follows: staff members shall wash their hands with soap and running water immediately after assisting a child in toileting. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.8(a)(1)(ii) — Handwashing requirements are as follows: the center shall ensure that children three months of age and older wash their hands with soap and running water immediately after using the toilet or having diapers changed. |
Yes |
| ? | Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Mon Sep 20 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Mon Sep 20 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Mon Sep 20 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(r) — The center shall take any steps required by the Office of Licensing to correct conditions in the building or center that may endanger the health, safety, and well-being of the children served. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.6(a)(1) — The methods of guidance and discipline used shall: be positive. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(e)(1)(iv) — For early childhood programs, the following shall apply: in addition to the items specified in N.J.A.C. 3A:52-7.7(a)3, the following equipment items or surfaces shall be washed and disinfected after each use, toys mouthed by infants and toddlers before being given to another child. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.6(a)(2) — The center shall take immediate necessary action to protect the child from further harm and shall immediately notify the child's parent(s) when a child sustains a head or facial injury, including when a child bumps his or her head. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.6(b)(1) — The center shall maintain on file a written record of each incident resulting in an injury as specified in N.J.A.C. 3A:52-7.6(a). These records shall include the following: the name of the injured child. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.8(a)(1)(i) — Handwashing requirements are as follows: the center shall ensure that children three months of age and older wash their hands with soap and running water before intake of food. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.7(a)(1) — The center shall meet the following requirements for orientation training: the center shall ensure that all newly-hired staff receive orientation training within two weeks of hire and that no individual is left alone to supervise a child or group of children until orientation training is completed. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(2) — The center shall ensure that all staff members are trained in the method of keeping track of children and know how many children are in their care at all times. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(2) — The center shall ensure that all staff members are trained in the method of keeping track of children and know how many children are in their care at all times. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(e)(8) — For early childhood programs all staff that work with children under 2 1/2 years of age shall have training specific to this age group, which may include, but is not limited to, the New Jersey Infant/Toddler Credential administered through Professional Impact NJ, the Infant-Toddler Child Development Associate (CDA) Credential, or other trainings specifically related to the care of infants and toddlers. Each employee shall initiate this training within 90 days and complete it within one year. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(f)(3) — The staff development specified in N.J.A.C. 3A:52-4.8(a) through (d) shall be provided either by the center or by another source such as a college or university, community or professional organization, professional consultant, State agency, or an instructor approved by the Instructor Approval System of Professional Impact of New Jersey. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a)(1) — Topics of orientation training shall include supervising and tracking all children, as specified in N.J.A.C. 3A:52-4.3(a). |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.9(a) — The sponsor, sponsor representative, director, or any staff member shall verbally notify the State Central Registry Hotline (1-877 NJ ABUSE/1-877-652-2873) immediately whenever there is reasonable cause to believe that a child has been subjected to abuse or neglect by a staff member, or any other adult, pursuant to N.J.S.A. 9:6-8.9, 8.10, 8.13 and 8.14. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a) — The children shall be supervised directly by a staff member at all times, including during outdoor activities, rest and sleep, and walking through hallways. Toileting procedures shall be supervised by a staff member as appropriate for the ages and developmental needs of the children. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Wed Jul 21 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(b)(2) — When the center applies for a new license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that each staff member at least 18 years of age who is or will be working at the center on a regularly scheduled basis completes the CHRI fingerprinting process specified in N.J.A.C. 3A:52-4.11(a). Until the center receives the results of the CHRI background check for a new staff member from the Department of Human Services, the center shall ensure oversight of that person by another staff member and ensure that the person is not alone to supervise a child or group of children. |
Yes |
Inspections (76)
Nearby alternatives
| Facility | Score | City | Distance |
|---|---|---|---|
| CFS Head Start at Chews Landing | 0 | Lindenwold | — |
| All Smiles Learning Center | — | Lindenwold | — |
| CFS Head Start at Lindenwold | — | Lindenwold | — |
| Lindenwold Preschool | — | Lindenwold | — |
| Little Raindrops Christian Learning Center | — | Lindenwold | — |
| YMCA Prime Time at Lindenwold #4 | — | Lindenwold | — |
Get violation alerts for this daycare