New Jersey ›
Irvington › Watch Me Play Learn & Grow Academy
Watch Me Play Learn & Grow Academy
0Compliance score
Poor
Poor
Capacity 111. 0 to 13 Grow NJ Kids: Level 2
Violation history (86)
| Severity | Date | Standard / narrative | Corrected |
|---|---|---|---|
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(b) — An applicant seeking a license or a Certificate of Life/Safety Approval to operate a center shall comply with all applicable provisions of the New Jersey Uniform Fire Code, as specified in N.J.A.C. 5:70 and hereinafter referred to as the NJUFC. The center shall obtain the building's fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, reflecting the center's compliance with all applicable provisions of the NJUFC. The center shall maintain on file the building's fire safety inspection certificate. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.1(d) — the Staff Records Checklist for the current director and all staff members currently working at the center shall be maintained on file at the center. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(a) — As a condition of securing a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall provide for himself or herself, and shall obtain from all staff members who are or will be working at the center on a regularly scheduled basis, written consent for the Department to conduct a Child Abuse Record Information (CARI) background check to determine whether an incident of child abuse or neglect has been substantiated against any such person. If a staff member refused to consent to a CARI background check, the sponsor or sponsor representative shall immediately terminate the staff member's employment at the center. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). If a staff member refuses to consent to a CHRI background check, the sponsor or sponsor representative shall immediately terminate the staff member’s employment at the center. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(c) — If the center prepares meals, the center shall obtain a satisfactory Sanitary Inspection Certificate, as specified in N.J.A.C. 8:24, indicating that the kitchen is in compliance with the applicable requirements of the State Sanitary Code. The center shall maintain on file the Sanitary Inspection Certificate. 6.3(a)2 If the center chooses to provide food, the center shall ensure that all food served to children is prepared by either: i. The center on-site or off-site; or ii. A caterer who is licensed, registered, certified, or otherwise approved, as appropriate, by the local or county health department or State Department of Health, as applicable. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(1)(i) — Each crib or playpen shall be equipped with: a firm, waterproof, snugly fitting mattress; a clean, snugly fitting sheet; top rails that are at least 19 inches above the mattress and slats that are not more than 2 3/8 inches apart. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(e)(1)(iii) — In addition to the items specified in (a)3 above, the following equipment items or surfaces shall be washed and disinfected after each use: iii. Diapering surfaces; |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to develop and implement written policies and procedures for the operation of the center, including a table of organization that illustrates lines of authority, responsibility and communication; and job descriptions, titles and qualifications for all center staff. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(10) — Indoor maintenance and sanitation requirements are as follows: all corrosive agents, insecticides, bleaches, detergents, polishes, any products under pressure in an aerosol spray can, and any toxic substance shall be stored in a locked cabinet or in an enclosure located in an area not accessible to the children. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(10) — Indoor maintenance and sanitation requirements are as follows: all corrosive agents, insecticides, bleaches, detergents, polishes, any products under pressure in an aerosol spray can, and any toxic substance shall be stored in a locked cabinet or in an enclosure located in an area not accessible to the children. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(19) — the center shall test for the presence of radon gas in each classroom on the lowest floor level used by children at least once every five years and shall post the test results in a prominent location in all buildings at the center, as specified in N.J.S.A. 30:5B-5.2. |
Yes |
| ? | Fri Nov 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields. During program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. Parking areas, pedestrian walkways, or other exterior portions of the premises subject to use by center occupants at night shall be illuminated to provide safe entrance to and egress from the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(c)(1) — For early childhood programs, the following shall apply: or all centers, the head teacher or consulting head teacher shall meet the qualification requirements specified in one of the seven options set forth in N.J.A.C. 3A:52-4.6(c) for education and experience. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(c)(1) — For early childhood programs, the following shall apply: for all centers, the head teacher or consulting head teacher shall meet the qualification requirements specified in one of the seven options set forth in N.J.A.C. 3A:52-4.6(c) for education and experience. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(c) — The center shall ensure that all staff members who work at the center complete 12 hours of continuing staff development each year. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(b) — Orientation training as specified in N.J.A.C. 3A:52-4.8(a) may be included for six of the required hours of staff development specified in N.J.A.C. 3A:52-4.8(c) and (d). |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(8) — The center shall obtain a Life Hazard Use Registration certificate applicable to the center’s licensed capacity and ages served pursuant to the Uniform Fire Safety Act, N.J.S.A. 52:27D-192 et seq. The center shall post this document in a prominent location within the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(1) — The director shall be scheduled to work at the center at least 50 percent of the center’s daily operating hours. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(3) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). If a staff member refuses to consent to a CHRI background check, the sponsor or sponsor representative shall immediately terminate the staff member’s employment at the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(n)(4) — Fire prevention requirements are as follows: all fire extinguishers shall be visually inspected once a month, and serviced and tagged at least once a year and recharged, if necessary, as specified in the NJUFC. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(d) — An applicant seeking the renewal of a license or of a Certificate of Life/Safety Approval to continue operating a center shall obtain and maintain on file a fire safety inspection certificate for the building based on a fire inspection conducted within the preceding 12 months. If the center prepares meals, the applicant seeking renewal shall obtain and maintain on file a satisfactory Sanitary Inspection Certificate, as specified in N.J.A.C. 8:24, indicating that the kitchen is in compliance with the applicable requirements of the State Sanitary Code, based on a sanitary inspection conducted within the preceding 12 months. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(1) — The director shall be scheduled to work at the center at least 50 percent of the center’s daily operating hours. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(8) — The center shall obtain a Life Hazard Use Registration certificate applicable to the center’s licensed capacity and ages served pursuant to the Uniform Fire Safety Act, N.J.S.A. 52:27D-192 et seq. The center shall post this document in a prominent location within the center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. the Office of Licensing shall not issue licenses or renewals to child care centers that are co-located in a building or other structure that contains a dry cleaner or nail salon unless the applicant obtains indoor air sampling that demonstrates that there is no impact to the child care center. |
Yes |
| ? | Thu Oct 03 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(d) — An applicant seeking the renewal of a license or of a Certificate of Life/Safety Approval to continue operating a center shall obtain and maintain on file a fire safety inspection certificate for the building based on a fire inspection conducted within the preceding 12 months. If the center prepares meals, the applicant seeking renewal shall obtain and maintain on file a satisfactory Sanitary Inspection Certificate, as specified in N.J.A.C. 8:24, indicating that the kitchen is in compliance with the applicable requirements of the State Sanitary Code, based on a sanitary inspection conducted within the preceding 12 months. |
Yes |
| ? | Tue Jun 20 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(2) — The center shall ensure that all staff members are trained in the method of keeping track of children and know how many children are in their care at all times. |
Yes |
| ? | Tue Jun 20 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(i) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall not have full-time classroom responsibilities during the times when the director is not present at the center. |
Yes |
| ? | Thu Mar 02 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(1)(ii) — Space and room requirements are as follows: all space and rooms within the center to be used by children shall be inspected and approved by the Office of Licensing prior to their use. In making its determination, the Office of Licensing shall consider whether the space is too far removed, remote, or isolated from other areas of the center to be used by children. rooms or areas of the center that are not Office of Licensing-approved for use by children shall be made inaccessible to children. |
Yes |
| ? | Thu Mar 02 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Thu Mar 02 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(i) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall not have full-time classroom responsibilities during the times when the director is not present at the center. |
Yes |
| ? | Tue Jan 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(1) — The center shall develop and implement an Office of Licensing-approved method to keep track of the location and ensure the safety of all children at all times when under the center’s supervision, including the transfer of supervision from and to parents during arrival and departure and the utilization of off-site locations, including playgrounds and field trips. |
Yes |
| ? | Mon Dec 05 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(1) — The center shall provide sleeping equipment for children 12 months of age and younger, the center shall provide for each child a crib, that complies with the Consumer Product Safety Commission's (CPSC) Federal Safety Standards for Full- Size and Non-Full-Size Baby Cribs; 16 CFR 1219 and 1220, which is incorporated herein by reference, and can be obtained through the CPSC's website at https://www.cpsc.gov/Safety-Education/Safety- Education-Centers/cribs , playpen, or other Office of Licensing-approved sleeping equipment that meets the following requirement that |
Yes |
| ? | Mon Dec 05 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(2)(ii) — Space and room requirements are as follows: at no time shall a center allow more children in attendance than the licensed room capacity. |
Yes |
| ? | Mon Dec 05 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a)(1) — The center shall develop and implement an Office of Licensing-approved method to keep track of the location and ensure the safety of all children at all times when under the center’s supervision, including the transfer of supervision from and to parents during arrival and departure and the utilization of off-site locations, including playgrounds and field trips. |
Yes |
| ? | Fri Nov 04 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(6) — Outdoor maintenance and sanitation requirements are as follows: centers that provide outdoor space shall maintain all fencing in proper condition. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(6) — Outdoor maintenance and sanitation requirements are as follows: centers that provide outdoor space shall maintain all fencing in proper condition. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(c)(1) — For early childhood programs, the following shall apply: for all centers, the head teacher or consulting head teacher shall meet the qualification requirements specified in one of the seven options set forth in N.J.A.C. 3A:52-4.6(c) for education and experience. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.1(g)(3) — For early childhood programs, the following shall apply: centers serving children 18 months of age and older shall provide at least five types of children's daily activities including, but not limited to, language; science and mathematics; manipulative; large muscle; building; art; music; drama; or other comparable activities; and at least five types of supplies and equipment for each daily activity chosen by the center. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.1(g)(3) — For early childhood programs, the following shall apply: centers serving children 18 months of age and older shall provide at least five types of children's daily activities including, but not limited to, language; science and mathematics; manipulative; large muscle; building; art; music; drama; or other comparable activities; and at least five types of supplies and equipment for each daily activity chosen by the center. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.1(g)(2) — For early childhood programs, the following shall apply: centers serving children less than 18 months of age shall provide at least four types of children's daily activities including, but not limited to, sensory; language and dramatic play; manipulative; building; large muscle; music; or other comparable activities; and at least four types of supplies and equipment for each activity area chosen by the center. |
Yes |
| ? | Wed Sep 07 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.1(b)(2) — The staff member(s) specified in N.J.A.C. 3A:52-4.5 who are responsible for developing and overseeing the implementation of the center's daily activities shall ensure that children have opportunities to choose materials freely and materials are accessible at all times except during lunch and nap time. |
Yes |
| ? | Tue Oct 05 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.3(b)(3)(iv)(1) — For early childhood programs, the following shall apply, feeding requirements for centers serving children less than 18 months of age are as follows: for bottles, each child's bottle(s) shall be labeled with the child's name and dated. |
Yes |
| ? | Tue Oct 05 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.3(a)(12)(ii) — All centers shall comply with the following requirements, the center shall ensure that these safety and sanitation practices are followed: sippy cups shall be labeled with the child’s name. |
Yes |
| ? | Tue Oct 05 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Tue Oct 05 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Mon Aug 05 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(1) — The center shall provide sleeping equipment for children 12 months of age and younger, the center shall provide for each child a crib, that complies with the Consumer Product Safety Commission's (CPSC) Federal Safety Standards for Full- Size and Non-Full-Size Baby Cribs; 16 CFR 1219 and 1220, which is incorporated herein by reference, and can be obtained through the CPSC's website at https://www.cpsc.gov/Safety-Education/Safety- Education-Centers/cribs , playpen, or other Office of Licensing-approved sleeping equipment that meets the following requirement that |
Yes |
| ? | Tue Jul 16 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Wed Jun 12 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(2)(ii) — Space and room requirements are as follows: at no time shall a center allow more children in attendance than the licensed room capacity. |
Yes |
| ? | Fri May 10 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(2)(i) — Space and room requirements are as follows: at no time shall a center allow more children in attendance than the licensed capacity as specified on the license or the Certificate of Life/Safety Approval. |
Yes |
| ? | Wed Apr 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3)(v) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to ensure the establishment of a staff member substitute system. | Yes |
| ? | Wed Apr 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(c) — The following staff/child ratios shall apply, except as specified in 3A:52-4.3(d) through (f): Age Staff/Child Ratio Under 18 months - 1:4 18 months up to 2 ½ years - 1:6 2 ½ years up to 4 years - 1:10 4 years - 1:12 5 years and older - 1:15 |
Yes |
| ? | Wed Apr 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.3(a)(11)(vi) — All centers shall comply with the following requirements, unless contraindicated by the parent or health care provider, the center shall ensure that food and beverages are in accordance with minimum Child and Adult Care Food Program's (CACFP) standards, contained in the Child and Adult Care Food Program, 7 CFR 226.20, which is incorporated herein by reference, and can be obtained at http://www.fns.usda.gov/cnd/care/childcare.htm, including portion size and nutritional value. |
Yes |
| ? | Wed Apr 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(d) — The following staff/child ratios shall apply during rest or sleep, when the criteria listed in 3A:52-4.3(d) 1, 2, and 3 are met: Age Staff/Child Ratio Under 18 months - 1:10 18 months to under 2 ½ years - 1:12 2 ½ years and above - 1:20 |
Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(ii) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall complete staff development in understanding licensing rules as provided by the Office. | Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(8) — The center shall obtain a Life Hazard Use Registration certificate applicable to the center’s licensed capacity and ages served pursuant to the Uniform Fire Safety Act, N.J.S.A. 52:27D-192 et seq. The center shall post this document in a prominent location within the center. | Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(b)(1) — The director shall meet the following qualification requirements for early childhood programs licensed to serve more than 30 children, the director shall meet the qualification requirements as specified in N.J.A.C 3A:52-4.6(b) for education and experience. | Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Fri Oct 19 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. | Yes |
| ? | Fri Apr 27 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.4(a)(7)(iii) — For early childhood programs, the following shall apply, outdoor space requirements for children over the age of 10 months are as follows: outdoor areas located near or adjacent to hazardous areas determined by the Office of Licensing to be unsafe (including, but not limited to, streets, roads, driveways, parking lots, railroad tracks, swimming pools, rivers, streams, steep grades, cliffs, open pits, high voltage boosters, or propane gas tanks) shall be fenced or otherwise protected by a natural or man-made barrier or enclosure. |
Yes |
Inspections (56)
Nearby alternatives
| Facility | Score | City | Distance |
|---|---|---|---|
| 5 Stars Learning Center Inc. | 0 | Irvington | — |
| Agape Children's Academy of New Jersey | 0 | Irvington | — |
| Christian Pentecostal After School | 0 | Irvington | — |
| Christian Pentecostal After School | 0 | Irvington | — |
| Christian Pentecostal After School | 0 | Irvington | — |
| Christian Pentecostal After School | 0 | Irvington | — |
Get violation alerts for this daycare