New Jersey ›
Bloomfield › Red Carpet Kids Child Care LLC
Red Carpet Kids Child Care LLC
0Compliance score
Poor
Poor
Capacity 99. 0 to 13 Grow NJ Kids: Level 2
Violation history (191)
| Severity | Date | Standard / narrative | Corrected |
|---|---|---|---|
| ? | Thu Jul 09 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Walls shall be painted or otherwise covered whenever there is evidence of: i. Excessive peeling or chipped paint; or ii. Heavily soiled conditions. |
— |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.3(b)(3)(iv)(1) — Feeding requirements for centers serving children less than 18 months of age are as follows: for bottles, each child's bottle(s) shall be labeled with the child's name and dated. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(d)(2) — steam and hot water pipes and radiators shall be protected by screens, guards, insulation, or any other suitable, non-combustible protective device. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(a)(2) — All areas to be disinfected shall first be washed with soap and water. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(10) — Indoor maintenance and sanitation requirements are as follows: all corrosive agents, insecticides, bleaches, detergents, polishes, any products under pressure in an aerosol spray can, and any toxic substance shall be stored in a locked cabinet or in an enclosure located in an area not accessible to the children. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: 1. The building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. 2. The outdoor play area shall be graded or provided with drains to dispose of surface water. |
Yes |
| ? | Mon Jun 08 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(10) — Indoor maintenance and sanitation requirements are as follows: all corrosive agents, insecticides, bleaches, detergents, polishes, any products under pressure in an aerosol spray can, and any toxic substance shall be stored in a locked cabinet or in an enclosure located in an area not accessible to the children. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(d) — An applicant seeking the renewal of a license or of a Certificate of Life/Safety Approval to continue operating a center shall obtain and maintain on file a fire safety inspection certificate for the building based on a fire inspection conducted within the preceding 12 months. If the center prepares meals, the applicant seeking renewal shall obtain and maintain on file a satisfactory Sanitary Inspection Certificate, as specified in N.J.A.C. 8:24, indicating that the kitchen is in compliance with the applicable requirements of the State Sanitary Code, based on a sanitary inspection conducted within the preceding 12 months. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: The building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(10) — Indoor maintenance and sanitation requirements are as follows: all corrosive agents, insecticides, bleaches, detergents, polishes, any products under pressure in an aerosol spray can, and any toxic substance shall be stored in a locked cabinet or in an enclosure located in an area not accessible to the children. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(3) — The center shall identify all rooms of the center that have been approved by the Office of Licensing. This identification shall consist of numbers, letters, names or any other means of identification and shall be located either inside or directly outside each room. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.4(a)(1) — For early childhood programs, the following shall apply, all electrical outlets that are accessible to the children shall have protective covers. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(d)(2) — steam and hot water pipes and radiators shall be protected by screens, guards, insulation, or any other suitable, non-combustible protective device. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(16) — Walls shall be painted or otherwise covered whenever there is evidence of: i. Excessive peeling or chipped paint; or ii. Heavily soiled conditions. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.2(a)(1) — The center shall provide a supply of age-appropriate and developmentally appropriate program equipment including play equipment, child-size furniture and supplies that are sufficient to meet the daily activity needs of the children and the program. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(1) — 1. For children 12 months of age and younger, the center shall provide for each child a crib, that complies with the Consumer Product Safety Commission's (CPSC) Federal Safety Standards for Full-Size and Non-Full-Size Baby Cribs; 16 CFR 1219 and 1220, which is incorporated herein by reference, and can be obtained through the CPSC's website at https://www.cpsc.gov/Safety-Education/Safety- Education-Centers/cribs , playpen, or other Office of Licensing-approved sleeping equipment that meets the following requirements: i. Each cot used for children between 13 and 18 months of age shall not exceed 14 inches above the floor level. iii. Each mat used for rest and sleep shall be: (1) Placed on a surface that is warm, dry, clean and draft-free; (2) Water-repellent; (3) At least one inch thick; and (4) Stored so that there is no contact with the sleeping surface of another mat, or disinfected after each use, as specified in N.J.A.C. 3A:52- |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.1(d) — the Staff Records Checklist for the current director and all staff members currently working at the center shall be maintained on file at the center. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). If a staff member refuses to consent to a CHRI background check, the sponsor or sponsor representative shall immediately terminate the staff member’s employment at the center. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Wed Jul 30 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Tue Jul 30 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: the building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.8(a)(1)(i) — Handwashing requirements are as follows: the center shall ensure that children three months of age and older wash their hands with soap and running water before intake of food. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(4) — Indoor maintenance and sanitation requirements are as follows: carpeting shall be securely fastened to the floor. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(f)(1) — The staff development specified in N.J.A.C. 3A:52-4.8(a) through (d) shall be clock hours of staff development. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(g)(3) — The center shall maintain on file documentation of the date, time, topic, presenter, and attendance for all staff development and orientation completed by center staff members. The center shall record each staff member’s completion of staff development and orientation on the Staff Records Checklist, as specified in N.J.A.C. 3A:52-4.1(b). |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(n)(1) — Fire prevention requirements are as follows: the center shall conduct fire drills at least once a month, as specified in the NJUFC. The center shall ensure that fire drills are conducted during each session provided at the center and that one fire drill per year is conducted during nap time, if applicable. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(d)(1) — Heating requirements are as follows: a minimum temperature of 68 degrees Fahrenheit shall be maintained in all areas used by children, including, but not limited to, classrooms and bathrooms. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.4(a)(1) — For early childhood programs, the following shall apply, all electrical outlets that are accessible to the children shall have protective covers. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.6(c) — Bites and injuries other than those specified in N.J.A.C. 3A:52-7.6(a) shall be reported to the child's parent by the end of the day. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.6(b)(1) — The center shall maintain on file a written record of each incident resulting in an injury as specified in N.J.A.C. 3A:52-7.6(a). These records shall include the following: the name of the injured child. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.6(a)(2) — The center shall take immediate necessary action to protect the child from further harm and shall immediately notify the child's parent(s) when a child sustains a head or facial injury, including when a child bumps his or her head. |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.5(b)(7) — The center shall develop and follow a policy on the administration of medication and health care procedures to children, which shall include the following provisions: the center shall maintain on file a record of the following |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.5(b)(7) — The center shall develop and follow a policy on the administration of medication and health care procedures to children, which shall include the following provisions: the center shall maintain on file a record of the following |
Yes |
| ? | Fri Jul 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.8(a)(1) — The center shall complete and maintain on file for each enrolled child a Children’s Records Checklist, signed by the director, sponsor, or sponsor representative and designated by the Office of Licensing, indicating that the center has obtained documentation of the child's name, address, birth date, and date of enrollment. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.6(a)(1) — The methods of guidance and discipline used shall: be positive. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a) — The children shall be supervised directly by a staff member at all times, including during outdoor activities, rest and sleep, and walking through hallways. Toileting procedures shall be supervised by a staff member as appropriate for the ages and developmental needs of the children. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Tue Apr 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a)(1) — Topics of orientation training shall include supervising and tracking all children, as specified in N.J.A.C. 3A:52-4.3(a). |
Yes |
| ? | Mon Feb 26 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.8(d)(1)(i)(1) — For early childhood programs, the following shall apply: diapering requirements for centers serving children who are not toilet trained are as follows, staff members shall ensure that staff members shall ensure that each child's diaper is changed when wet or soiled. |
Yes |
| ? | Mon Feb 26 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a)(2) — Topics of orientation training shall include understanding center operations, policies and procedures, as specified in N.J.A.C. 3A:52-4.5(b)3. |
Yes |
| ? | Fri Dec 22 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(c)(1) — For early childhood programs, the following shall apply: for all centers, the head teacher or consulting head teacher shall meet the qualification requirements specified in one of the seven options set forth in N.J.A.C. 3A:52-4.6(c) for education and experience. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(g)(3) — The center shall maintain on file documentation of the date, time, topic, presenter, and attendance for all staff development and orientation completed by center staff members. The center shall record each staff member’s completion of staff development and orientation on the Staff Records Checklist, as specified in N.J.A.C. 3A:52-4.1(b). |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3)(i)(2) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to develop and implement written policies and procedures for the operation of the center, including job descriptions, titles and qualifications for all center staff. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.6(a) — At least five foot-candles of natural or artificial light shall be provided in all rooms used by children during naptime. The illumination shall be measured three feet above the floor at the farthest point from the light source. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.4(b)(2)(ii) — The center shall provide sleeping equipment for children over the age of 12 months and under the age of five years, the center shall provide for each child a crib that complies with the Consumer Product Safety Commission's (CPSC), Federal Safety Standards for Full-Size and Non-Full-Size Baby Cribs; 16 CRF 1219 and 1220, which is incorporated herein by reference, and can be obtained through the CPSC's website at http://www.cpsc.gov/businfo/frnotices/fr11/cribfinal.pdf, playpen, cot, mat, or other Office of Licensing-approved sleeping equipment that meets the following requirements: each cot or mat used for rest and sleep shall be covered with a sheet, blanket or other covering. An additional covering shall be provided for use as a covering for each child. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(n)(1) — Fire prevention requirements are as follows: the center shall conduct fire drills at least once a month, as specified in the NJUFC. The center shall ensure that fire drills are conducted during each session provided at the center and that one fire drill per year is conducted during nap time, if applicable. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(l)(4) — Emergency procedure requirements are as follows: the center shall conduct two lockdown drills per year and maintain on file a record of each lockdown drill. The center shall ensure that lockdown drills are conducted during each session provided at the center. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(i) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall not have full-time classroom responsibilities during the times when the director is not present at the center. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Tue Oct 10 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3)(i)(1) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to develop and implement written policies and procedures for the operation of the center, including a table of organization that illustrates lines of authority, responsibility and communication. |
Yes |
| ? | Tue Jun 27 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a)(1) — Topics of orientation training shall include supervising and tracking all children, as specified in N.J.A.C. 3A:52-4.3(a). |
Yes |
| ? | Tue Jun 27 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a) — The children shall be supervised directly by a staff member at all times, including during outdoor activities, rest and sleep, and walking through hallways. Toileting procedures shall be supervised by a staff member as appropriate for the ages and developmental needs of the children. |
Yes |
| ? | Tue Jun 27 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.3(a) — The children shall be supervised directly by a staff member at all times, including during outdoor activities, rest and sleep, and walking through hallways. Toileting procedures shall be supervised by a staff member as appropriate for the ages and developmental needs of the children. |
Yes |
| ? | Tue Jun 27 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.5(b)(10) — The center shall develop and follow a policy on the administration of medication and health care procedures to children, which shall include the following provisions: the center shall store prescribed epinephrine pens in their original boxes with the child’s name and prescription. A special care plan or other documentation from a health care provider shall accompany the epinephrine pen. If two epinephrine pens are required, both shall be available. Each center under the jurisdiction of N.J.S.A. 18A:40-12.5 shall store back-up epinephrine pens on site consistent with the requirements stated at N.J.S.A. 18A:40-12.5.e(1). |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(b) — Orientation training as specified in N.J.A.C. 3A:52-4.8(a) may be included for six of the required hours of staff development specified in N.J.A.C. 3A:52-4.8(c) and (d). |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Wed Nov 09 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(ii) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall complete staff development in understanding licensing rules as provided by the Office. |
Yes |
Inspections (85)
Nearby alternatives
| Facility | Score | City | Distance |
|---|---|---|---|
| Kiddie World Daycare | 0 | Bloomfield | — |
| Carteret Elementary School | 0 | Bloomfield | — |
| Education Station Day Care, Inc. | 0 | Bloomfield | — |
| Elite Daycare LLC | 0 | Bloomfield | — |
| Executive Baby, Inc. | 0 | Bloomfield | — |
| First Class Learning and Development Ctr.,Inc. | 0 | Bloomfield | — |
Get violation alerts for this daycare