DaycareLens
New JerseyDover › HeadStart Community Program of Morris County, Inc.

HeadStart Community Program of Morris County, Inc.

Child care center · 18 Thompson Ave, Dover, NJ 07801 · License 14HEA0003

0Compliance score
Poor

Capacity 192. 0 to 6 Grow NJ Kids: Level 5

Violation history (58)

SeverityDateStandard / narrativeCorrected
?Tue Jan 20 2026 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-6.4(a)(2) — For early childhood programs, the center shall ensure that blankets or pillows do not cover the child's face.
Ensure that blankets do not cover children's faces in rooms 2 & 3. Staff took immediate action and removed the blankets from the children's faces.
Yes
?Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Clean the bathroom vents in rooms 1,13, and 14.
Yes
?Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(5) — garbage receptacles shall be: made of durable, leak-proof and nonabsorbent materials; covered in a secure manner; emptied to the outdoor garbage receptacle when filled; maintained in a sanitary manner.
Clean the classroom garbage cans throughout the center.
Yes
?Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center.
Complete and submit a DCF Drinking Water Testing Checklist and Statement of Assurance and a copy of the center's water testing completed by a laboratory certified by the Department of Environmental Protection.
Yes
?Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Secure the vent to the ceiling tile in bathroom in room 8.
Yes
?Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition.
Repair the stained ceiling and wall in the bathroom in room 8.
Yes
?Wed Dec 17 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.1(d) — the Staff Records Checklist for the current director and all staff members currently working at the center shall be maintained on file at the center.
Complete and maintain on file, a current Staff Records Checklist designated by OOL.
Yes
?Wed Dec 17 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.10(b)(1) — Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member. Until the results of the CARI background check for a new staff member have been received from the Department, the center shall ensure oversight of the new staff member by another staff member, and ensure that person is not left alone to supervise a child or group of children.
Ensure that CARI background checks are completed as required for renewal.
Yes
?Wed Dec 17 2025 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-7.5(b)(10) — (9) The center shall develop and follow a policy on the administration of medication and health care procedures to children, which shall include the following provisions: before administering a health care procedure associated with a child’s health condition, such as the use of a blood glucose monitor, nebulizer, or epinephrine pen, the center shall ensure that all staff members who administer the procedure are taught to do so by the child’s parent or another appropriately-trained person. There shall be at least two staff members present at the center who are trained in such health care procedures. 10. The center shall store prescribed epinephrine pens in their original boxes with the child’s name and prescription. A special care plan or other documentation from a health care provider shall accompany the epinephrine pen. If two epinephrine pens are required, both shall be available. Each center under the jurisdiction of N.J.S.A. 18A:40-12.5 shall store back-up epinephrine pens on site consistent with the requirements stated at N.J.S.A. 18A:40- 12.5.e(1).
Ensure Epi-pens are stored in their original boxes with the child's name and prescription, accompanied by a special care plan that includes procedures for contacting parents and emergency medical services, and both epi-pens are present when two are required. 3 children are missing their 2nd epi-pen prescribed by their physician. 2 children are missing their special care plan from their health care provider.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located.
Submit a Safe Building Interior Certification.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(h)(3) — Lead paint precautions are as follows: the center shall ensure that a lead paint inspection of all painted surfaces of the center is conducted by a Lead Inspector/Risk Assessor, who is certified by the New Jersey Department of Community Affairs (DCA) and employed by either a public health agency or a lead evaluation contractor certified by DCA, as specified in N.J.A.C. 5:17. If the lead paint inspection indicates the center is free of lead-based paint hazards, the center shall submit documentation of the inspection results to the Office of Licensing and the local department of health. If the lead paint inspection indicates the presence of lead, the center shall ensure that a lead paint risk assessment of the center is conducted by a Lead Inspector/Risk Assessor, who is certified and employed as specified in N.J.A.C. 3A:52-5.3(h)3. The center shall submit documentation of the risk assessment results to the Office of Licensing and the local department of health.
Submit a lead paint risk assessment as required for the new space.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(7) — at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the facility operator shall submit to the Office of Licensing a No Further Action letter, Child Care Facility Approval letter, RESPONSE Action Outcome letter, or other approval, which indicates that no further remediation is needed for the site from the Department of Environmental Protection, which indicates that no further remediation is needed for the site on which the center is located.
Submit a No Further Action (NFA) or Child Care/Educational Facility Approval Letter from the Department of Environmental Protection (DEP) or a Response Action Outcome Letter (RAO) from a Licensed Site Remediation Professional (LSRP) for the additional outdoor play areas.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.2(a)(1) — For newly-constructed buildings, for existing buildings whose construction code group classification would change from that which it had been, or for existing buildings that require major alteration or renovation, the center shall obtain a Certificate of Occupancy (CO) issued by the municipality in which it is located, reflecting the center's compliance with the provisions of the NJUCC, and submit a copy of the CO to the Office of Licensing, for the following group classification: E (Educational) for buildings accommodating children 2 ½ years of age and older and having a total occupancy of six or more children; I-4 (Institutional) for buildings accommodating one or more children less than 2 ½ years of age; or A-3 (Assembly) or one of the group classifications specified in N.J.A.C. 3A:52-5.2(a)1i or ii for buildings accommodating school-age child care programs only.
Submit a copy of the final Certificate of Occupancy or Certificate of Continued Occupancy that indicates an I-4 use group for buildings accommodating children less than 2.5 years of age.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(7) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the facility operator shall submit to the Office of Licensing a No Further Action letter, Child Care Facility Approval letter, RESPONSE Action Outcome letter, or other approval, which indicates that no further remediation is needed for the site from the Department of Environmental Protection, which indicates that no further remediation is needed for the site on which the center is located.
Submit a No Further Action (NFA) or Child Care/Educational Facility Approval Letter from the Department of Environmental Protection (DEP) or a Response Action Outcome Letter (RAO) from a Licensed Site Remediation Professional (LSRP) for the additional outdoor play areas.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center.
Complete and submit a DCF Drinking Water Testing Checklist and Statement of Assurance and a copy of the center's water testing completed by a laboratory certified by the Department of Environmental Protection.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: the building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children.
Ensure all outdoor hazards are removed as required. Ensure construction materials are removed from the walkway outside the center next to the new space.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition.
Repair the sensor to the sink in room 13.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(19) — Indoor maintenance and sanitation requirements are as follows: the center shall test for the presence of radon gas in each classroom on the lowest floor level used by children at least once every five years and shall post the test results in a prominent location in all buildings at the center, as specified in N.J.S.A. 30:5B-5.2.
Test for the presence of radon gas in every room on the lowest floor used by children in each building and post the test results in a prominent location in each building.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Maintain all mechanical ventilation in operating condition in the bathroom in room 11.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.2(a)(1)(ii) — For newly-constructed buildings, for existing buildings whose construction code group classification would change from that which it had been, or for existing buildings that require major alteration or renovation, the center shall obtain a Certificate of Occupancy (CO) issued by the municipality in which it is located, reflecting the center's compliance with the provisions of the NJUCC, and submit a copy of the CO to the Office of Licensing, for the following group classification: I-4 (Institutional) for buildings accommodating one or more children less than 2 ½ years of age.
Submit a copy of the final Certificate of Occupancy or Certificate of Continued Occupancy that indicates an I-4 use group for buildings accommodating children less than 2.5 years of age.
Yes
?Thu Aug 29 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.4(a)(1) — For early childhood programs, the following shall apply, all electrical outlets that are accessible to the children shall have protective covers.
Provide protective coverings for all electrical outlets accessible to the children in room 14.
Yes
?Wed May 22 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-6.6(a)(1) — The methods of guidance and discipline used shall: be positive.
Based on report, ensure that staff utilize positive methods of guidance and discipline.
Yes
?Wed May 22 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.8(g)(1) — The center shall maintain on file documentation of the date, time, topic, presenter, and attendance for all staff development and orientation completed by center staff members. For staff development provided by the center, the center shall maintain on file documentation or a copy of all staff development materials used.
Based on report, retrain the named staff on the center's discipline policy.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Ensure staff immediately clean wet spills in the bathroom in room 4.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Ensure the resilient surfacing is even and level with the playground surface on the court yard playground.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Repair the loose netting protruding out from the resilient surfacing on the court yard playground.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(5)(ii) — Indoor maintenance and sanitation requirements are as follows: garbage receptacles shall be covered in a secure manner.
Ensure that garbage receptacles are maintained as required, including being covered securely throughout the classrooms.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Clean the red mat in front of the slide in room 8.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-6.4(g)(2) — When sheets, blankets and other coverings are not stored with sleeping equipment, each of these items shall be stored separately for each child.
Ensure that each child's bedding is stored separately in room 2.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Maintain all mechanical ventilation in a clean and operating condition in Rooms 1 and 5 bathrooms and the bathroom in the hallway outside room 1.
Yes
?Fri Mar 15 2024 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Ensure that all flooring is kept clean and in good repair in room 6.
Yes
?Fri Aug 18 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located.
Submit a Safe Building Interior Certification or other approval issued by the DOH.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Ensure that all ceiling tiles are kept clean and in good repair. Repair/replace stained ceiling tiles in Room 9. Center sent a picture of the repaired ceiling tiles.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Maintain all mechanical ventilation in a clean and operating condition. Clean toilet room vent in Room 11. Center sent a picture of the clean vent.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation.
Ensure that all staff, the sponsor and/or the sponsor representative complete a CHRI background check as required. Ensure that all staff, the sponsor and/or the sponsor representative complete a CHRI background check as required for the center's license renewal. Some Renewal CHRI's pending.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member.
Ensure that all staff submit a CARI background check upon renewal. Review of renewal CARI's-some pending.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Ensure that all ceiling tiles are kept clean and in good repair. Repair/replace stained ceiling tiles in Room 11. Center sent a picture of the repaired ceiling tiles.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of
Repair and/or paint the walls and other surfaces as required. Sand/paint rusted exit door in Room 7.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center.
Complete and submit a DCF Drinking Water Testing Checklist and Statement of Assurance and a copy of the center's water testing completed by a laboratory certified by the Department of Environmental Protection.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(h)(2) — Lead paint precautions are as follows: the center shall comply with the lead paint inspection requirements specified in N.J.A.C. 3A:52-5.3(h)3, unless the center
Submit a lead paint risk assessment as required. Last lead test: 5/12/20.
Yes
?Fri Jan 13 2023 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source.
Provide adequate lighting throughout the center. Repair/replace light bulbs in Room 9.
Yes
?Thu Jul 22 2021 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Upload documentation for playground equipment installed in former staff outdoor area.
Yes
?Thu Jul 22 2021 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
The center plans on installing resilient surfacing underneath new playground equipment. Upload ASTM information for review.
Yes
?Tue Dec 22 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(m)(2) — Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit.
At the time of the inspection, children were observed sitting in front of the exit door. Cite and abate.
Yes
?Tue Dec 22 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located.
Provide an updated DOH certificate.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition.
The center shall ensure that the bathrooms are clean and free of any urine. Classroom 1
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated.
Clean both bathroom vents in Room 1.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school.
Provide an updated fire certificate.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-7.3(a)(2) — For early childhood programs, the following shall apply: for each child not enrolled in a public or private school, upon admission, the center shall maintain on file at the center a Universal Child Health Record (Department of Health Form CH-14) or its equivalent, updated annually, along with an immunization record, and a special care plan, if applicable. A 30-day grace period is permitted in N.J.A.C. 8:57-4.5(e)
The center shall ensure all Universal Health Records are updated.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of
Repaint white chipped walls in Room 4(right side of classroom).
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(2) — Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
The large beige rug in Room 2 shall be cleaned and sanitized.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center.
Provide a state of assurance with water test results.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields.
Replace broken plastic light cover in Room 2.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(c)(2) — Lighting requirements are as follows: during program activities, at least 20 foot-candles of natural or artificial light shall be provided in all rooms used by the children. This illumination shall be measured three feet above the floor at the farthest point from the light source.
Replace light bulbs in Room 6.
Yes
?Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-5.3(a)(16) — Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of
Repaint chipped blue wall in Room 2.
Yes
?Tue Oct 08 2019 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d).
The center's SRC shall be updated to include all new staff.
Yes
?Tue Oct 08 2019 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member.
The center is missing 2 staff CARI's.
Yes
?Tue Oct 08 2019 00:00:00 GMT+0000 (Coordinated Universal Time) 3A:52-7.5(b)(10) — The center shall develop and follow a policy on the administration of medication and health care procedures to children, which shall include the following provisions: the center shall store prescribed epinephrine pens in their original boxes with the child’s name and prescription. A special care plan or other documentation from a health care provider shall accompany the epinephrine pen. If two epinephrine pens are required, both shall be available. Each center under the jurisdiction of N.J.S.A. 18A:40-12.5 shall store back-up epinephrine pens on site consistent with the requirements stated at N.J.S.A. 18A:40-12.5.e(1).
One named requires a 2nd epi-pen and antihistamine.
Yes

Severity 5 = most serious. Source: official state record.

Inspections (41)

41 inspection record(s) on file from NJ-DCF.

Nearby alternatives

FacilityScoreCityDistance
Dennis O'Brien School 0 Dover
Dover Child Care Center, Inc. Infant/Toddler and Pre-School 0 Dover
El Primer Paso Ltd 0 Dover
Imagine and Learn Childcare Center 0 Dover
Project Safe After School Program 0 Dover
Project Safe After School Program 0 Dover

Licensed facilities near this one, highest compliance score first.

Get violation alerts for this daycare

We'll email you when a new inspection or violation is posted. Free.