New Jersey ›
Rockaway › White Meadow Lake Preschool
White Meadow Lake Preschool
0Compliance score
Poor
Poor
Capacity 35. 2½ to 6
Violation history (56)
| Severity | Date | Standard / narrative | Corrected |
|---|---|---|---|
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(d) — The director, head teacher(s), group teacher(s), and program supervisor(s) shall each complete 20 hours of staff development each year. Recommended topics of training for these staff include educational and physical activity; special needs programming and program development; social-emotional and behavioral development for young children; legal issues, including ADA guidelines and leadership and advocacy. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7)(i) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. Centers that take children to a community playground shall ensure that the playground surfacing and all other elements comply with the Playground Safety Subcode before being used by the children. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(a)(4) — When a person who is not required to complete a CARI background check is working with children at the center, the center shall ensure oversight of that person by another staff member and ensure that person is not left alone to supervise a child or group of children. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.7(a)(1) — The center shall meet the following requirements for orientation training: the center shall ensure that all newly-hired staff receive orientation training within two weeks of hire and that no individual is left alone to supervise a child or group of children until orientation training is completed. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(1) — (a) Indoor maintenance and sanitation requirements are as follows: 1. The center shall be free of moisture resulting from water leaks or seepage. 2. Floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair. 4. Carpeting shall be securely fastened to the floor. 9. Toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(15) — Indoor maintenance and sanitation requirements are as follows: ventilation outlets shall be clean and free from obstructions, and filters shall be replaced when saturated. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: 1. The building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. 2. The outdoor play area shall be graded or provided with drains to dispose of surface water. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(1) — Outdoor maintenance and sanitation requirements are as follows: 1. The building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children. 2. The outdoor play area shall be graded or provided with drains to dispose of surface water. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(f)(2) — Toilet facility requirements are as follows: mirrors, dispensers, and other equipment shall be fastened securely. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(o)(1) — First aid requirements are as follows: at least two staff members who have current certified basic knowledge of first aid principles and cardiopulmonary resuscitation (CPR), as defined by a recognized health organization (such as the American Red Cross), shall be in the center at all times when enrolled children are present. The first aid and CPR training shall include a hands-on training component in addition to any online training coursework. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.1(d) — the Staff Records Checklist for the current director and all staff members currently working at the center shall be maintained on file at the center. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). If a staff member refuses to consent to a CHRI background check, the sponsor or sponsor representative shall immediately terminate the staff member’s employment at the center. |
Yes |
| ? | Mon Sep 08 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(c) — The center shall ensure that all staff members who work at the center complete 12 hours of continuing staff development each year. Orientation training as specified in N.J.A.C. 3A:52-4.8(a) may be included for six of the required hours of staff development specified in N.J.A.C. 3A:52-4.8(c) and (d). |
Yes |
| ? | Thu Sep 21 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(r) — The center shall take any steps required by the Office of Licensing to correct conditions in the building or center that may endanger the health, safety, and well-being of the children served. |
Yes |
| ? | Thu Sep 21 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(6) — Outdoor maintenance and sanitation requirements are as follows: centers that provide outdoor space shall maintain all fencing in proper condition. |
Yes |
| ? | Thu Sep 21 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a) — A person seeking a license or a Certificate of Life/Safety Approval to operate a center shall comply with all applicable provisions of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23 (hereinafter referred to as the “NJUCC”). |
Yes |
| ? | Thu Sep 21 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(q)(1)(ii) — Space and room requirements are as follows: all space and rooms within the center to be used by children shall be inspected and approved by the Office of Licensing prior to their use. In making its determination, the Office of Licensing shall consider whether the space is too far removed, remote, or isolated from other areas of the center to be used by children. rooms or areas of the center that are not Office of Licensing-approved for use by children shall be made inaccessible to children. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(9) — Indoor maintenance and sanitation requirements are as follows: toilets, wash basins, kitchen sinks, and other plumbing shall be maintained in good operating and sanitary condition. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(2) — Outdoor maintenance and sanitation requirements are as follows: the outdoor play area shall be graded or provided with drains to dispose of surface water. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(13) — Indoor maintenance and sanitation requirements are as follows: the center shall ensure that window blind cords and other cords and ropes that present risk of harm are inaccessible to children. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.3(a)(2) — For early childhood programs, the following shall apply: for each child not enrolled in a public or private school, upon admission, the center shall maintain on file at the center a Universal Child Health Record (Department of Health Form CH-14) or its equivalent, updated annually, along with an immunization record, and a special care plan, if applicable. A 30-day grace period is permitted in N.J.A.C. 8:57-4.5(e) |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(b)(2) — Centers that maintain outside sandboxes or play areas containing sand shall ensure that the sand is maintained in a safe and sanitary manner. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.8(a)(7) — The center shall complete and maintain on file for each enrolled child a Children’s Records Checklist, signed by the director, sponsor, or sponsor representative and designated by the Office of Licensing, indicating that the center has obtained documentation of health information for each child, as follows: |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(c)(1) — Lighting requirements are as follows: all fluorescent tubes and incandescent light bulbs shall have protective covers or shields. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(h)(7)(i) — Lead paint precautions are as follows: if a previous lead paint inspection indicates the presence of lead, or a lead paint risk management plan is in progress at the center, the center shall ensure that a lead paint risk assessment is conducted by a Lead Inspector/Risk Assessor who is certified and employed as specified in N.J.A.C. 3A:52-5.3(h)3, upon renewal of the center’s license. |
Yes |
| ? | Tue May 23 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(o)(1) — First aid requirements are as follows: at least two staff members who have current certified basic knowledge of first aid principles and cardiopulmonary resuscitation (CPR), as defined by a recognized health organization (such as the American Red Cross), shall be in the center at all times when enrolled children are present. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(n)(1) — Fire prevention requirements are as follows: the center shall conduct fire drills at least once a month, as specified in the NJUFC. The center shall ensure that fire drills are conducted during each session provided at the center and that one fire drill per year is conducted during nap time, if applicable. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.11(a)(1) — Each center shall develop a written policy on the management of communicable diseases. This policy shall include the following: the list of illnesses and symptoms of illness for which a child will be separated from the group and possibly sent home, as specified in N.J.A.C. 3A:52-7.1©. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(h)(7)(i) — Lead paint precautions are as follows: if a previous lead paint inspection indicates the presence of lead, or a lead paint risk management plan is in progress at the center, the center shall ensure that a lead paint risk assessment is conducted by a Lead Inspector/Risk Assessor who is certified and employed as specified in N.J.A.C. 3A:52-5.3(h)3, upon renewal of the center’s license. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.8(j)(1) — The center shall develop and follow a written policy on the expulsion of children from enrollment at the center. The expulsion policy shall include |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(r) — The center shall take any steps required by the Office of Licensing to correct conditions in the building or center that may endanger the health, safety, and well-being of the children served. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.6(e)(1) — The center shall maintain on file a written policy on the disciplining of children by staff members. The policy shall reflect the provisions specified in N.J.A.C. 3A:52-6.6(a) through (c) and include the acceptable actions that a staff member may take when disciplining a child (that is, discussion with the child, time-out, etc.). |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(c)(2)(ii) — The director or his or her designee(s) shall be on the premises at all times when the center is operating and the designee shall complete staff development in understanding licensing rules as provided by the Office. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(b)(2)(ii) — The director shall have the authority and responsibility for the implementation of policies and procedures for the day-to-day operation of the center, including maintenance of children's daily attendance records, including the daily time of arrival and departure. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(b)(2)(i) — The director shall have the authority and responsibility for the implementation of policies and procedures for the day-to-day operation of the center, including maintenance of staff attendance records indicating daily hours worked. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3)(i)(2) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to develop and implement written policies and procedures for the operation of the center, including job descriptions, titles and qualifications for all center staff. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.6(a) — The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d). |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(g)(3) — The center shall maintain on file documentation of the date, time, topic, presenter, and attendance for all staff development and orientation completed by center staff members. The center shall record each staff member’s completion of staff development and orientation on the Staff Records Checklist, as specified in N.J.A.C. 3A:52-4.1(b). |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(8) — The center shall obtain a Life Hazard Use Registration certificate applicable to the center’s licensed capacity and ages served pursuant to the Uniform Fire Safety Act, N.J.S.A. 52:27D-192 et seq. The center shall post this document in a prominent location within the center. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(a)(19) — Indoor maintenance and sanitation requirements are as follows: the center shall test for the presence of radon gas in each classroom on the lowest floor level used by children at least once every five years and shall post the test results in a prominent location in all buildings at the center, as specified in N.J.S.A. 30:5B-5.2. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-3.4(a) — The sponsor or sponsor representative shall secure comprehensive general liability insurance coverage for the center and shall maintain on file a copy of the insurance policy or documentation of current insurance coverage. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.9(a)(1) — For early childhood programs, the following shall apply: the center shall maintain on file a log of the initial illnesses, symptoms of illness, or diseases that are exhibited by each child while in the center’s care, as specified in N.J.A.C. 3A:52-7.1(c) and (d). This illness log shall include |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(a)(3)(i)(1) — The sponsor or sponsor representative shall designate individuals with the authority and responsibility to develop and implement written policies and procedures for the operation of the center, including a table of organization that illustrates lines of authority, responsibility and communication. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Thu Sep 09 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Tue Sep 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(l)(1)(iii) — Emergency procedure requirements are as follows: the center shall prepare written emergency procedures delineating an alternate indoor location that operates during the same operating hours as the center. The center shall |
Yes |
| ? | Mon Nov 05 2018 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(8) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center, and, as determined by the Office of Licensing, on a case-by-case basis, the facility operator shall submit to the Office of Licensing a Safe Building Interior Certification or other approval issued by the Department of Health that indicates that no further remediation is needed for the interior of the building in which the center is located. |
Yes |
Inspections (33)
Nearby alternatives
| Facility | Score | City | Distance |
|---|---|---|---|
| Birchwood School | 46 | Rockaway | — |
| First Presbyterian Cooperative Nursery School | 28 | Rockaway | — |
| Blue Skies Day Care | 0 | Rockaway | — |
| BORO Kids 2 TJS | 0 | Rockaway | — |
| Bridges to Learning | 0 | Rockaway | — |
| Bright Horizons at Rockaway | 0 | Rockaway | — |
Get violation alerts for this daycare