New Jersey ›
Ogdensburg › Roe's Country Day Care
Roe's Country Day Care
0Compliance score
Poor
Poor
Capacity 30. 0 to 13
Violation history (25)
| Severity | Date | Standard / narrative | Corrected |
|---|---|---|---|
| ? | Tue Jan 06 2026 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-7.7(a)(1)(ii) — Disinfectants shall be used as follows: the center shall disinfect those items specified in N.J.A.C. 3A:52-7.7(a)3 with a solution that shall be a self-made solution consisting of one-quarter cup of household bleach to each gallon of water (one tablespoon per quart), which shall be prepared daily and placed in a labeled, sealed container. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.5(e)(7) — For early childhood programs for centers using a consulting head teacher, the consulting head teacher shall make at least two on-site visits to the center per month, for a sufficient length of time to conduct staff development, observe the center's program, and ensure that the provisions specified in N.J.A.C. 3A:52-4.5(e)1 are met. The center shall maintain on file a written record of the date, time, purpose, and nature of each visit by the consulting head teacher; and the consulting head teacher’s observation of the program and evaluation of the staff member in charge of the program. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.1(d) — the Staff Records Checklist for the current director and all staff members currently working at the center shall be maintained on file at the center. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(a) — As a condition of securing a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall provide for himself or herself, and shall obtain from all staff members who are or will be working at the center on a regularly scheduled basis, written consent for the Department to conduct a Child Abuse Record Information (CARI) background check to determine whether an incident of child abuse or neglect has been substantiated against any such person. If a staff member refused to consent to a CARI background check, the sponsor or sponsor representative shall immediately terminate the staff member's employment at the center. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(a) — (a) Topics of orientation training shall include all of the following: 1. Supervising and tracking all children, as specified in N.J.A.C. 3A:52-4.3(a); 2. Understanding center operations, policies and procedures, as specified in N.J.A.C. 3A:52-4.5(b)3; 3. Implementing group size limits and primary caregiver responsibilities, as applicable, as specified in N.J.A.C. 3A:52-4.4; 4. Recognizing and reporting child abuse or neglect, as specified in N.J.A.C. 3A:52-4.9; 5. Evacuating the center and using the fire alarms, as specified in N.J.A.C. 3A:52-5.3(l); 6.Implementing the center’s release policy, as specified in N.J.A.C. 3A:52-6.5; 7. Implementing the center's statement of policy on the disciplining of children, as specified in N.J.A.C. 3A:52-6.6; 8. Implementing health practices, including medication administration and responding to symptoms of illness, as specified in N.J.A.C. 3A:52-7.1 through 7.11; 9. Implementing safe sleep practices to prevent Sudden Infant Death Syndrome; 10. Preventing Shaken Baby Syndrome and Abusive Head Trauma; 11. Recognizing and responding to injuries and emergencies, including the prevention of and response to emergencies due to food-related allergies and other allergic reactions; and 12. Including children with special needs in the center’s program. |
Yes |
| ? | Wed Dec 03 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). If a staff member refuses to consent to a CHRI background check, the sponsor or sponsor representative shall immediately terminate the staff member’s employment at the center. |
Yes |
| ? | Mon Jan 27 2025 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.6(a)(1) — The methods of guidance and discipline used shall: be positive. |
Yes |
| ? | Mon Dec 09 2024 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Thu Jan 12 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Jan 12 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.11(a)(1) — As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation. |
Yes |
| ? | Thu Jan 12 2023 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-2.1(b) — A person applying for an initial license or renewal license to operate a center or relocation of a center shall submit a completed application to the Office of Licensing at least 45 days prior to the anticipated opening of the center or to the expiration of its existing regular license. |
Yes |
| ? | Wed Oct 12 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Wed Oct 12 2022 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. |
Yes |
| ? | Tue Aug 17 2021 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(b) — An applicant seeking a license or a Certificate of Life/Safety Approval to operate a center shall comply with all applicable provisions of the New Jersey Uniform Fire Code, as specified in N.J.A.C. 5:70 and hereinafter referred to as the NJUFC. The center shall obtain the building's fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, reflecting the center's compliance with all applicable provisions of the NJUFC. The center shall maintain on file the building's fire safety inspection certificate. |
Yes |
| ? | Thu Jan 16 2020 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(p) — Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors. |
Yes |
| ? | Thu Jan 16 2020 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.10(b)(1) — When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member. |
Yes |
| ? | Thu Jan 16 2020 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(i)(5)(i) — Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center. |
Yes |
| ? | Thu Jan 16 2020 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(b)(7) — Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. |
Yes |
| ? | Tue Aug 13 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.2(a)(5) — The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school. | Yes |
| ? | Tue Aug 13 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-5.3(l)(4) — Emergency procedure requirements are as follows: the center shall conduct two lockdown drills per year and maintain on file a record of each lockdown drill. The center shall ensure that lockdown drills are conducted during each session provided at the center. | Yes |
| ? | Tue Aug 13 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-6.1(e) — The center shall ensure that pacifiers are removed when the children are crawling or walking. | Yes |
| ? | Tue Aug 13 2019 00:00:00 GMT+0000 (Coordinated Universal Time) | 3A:52-4.8(b) — Orientation training as specified in N.J.A.C. 3A:52-4.8(a) may be included for six of the required hours of staff development specified in N.J.A.C. 3A:52-4.8(c) and (d). |
Yes |
Inspections (31)
Nearby alternatives
| Facility | Score | City | Distance |
|---|---|---|---|
| K.E.E.P., Inc., Ogdenburg School | — | Ogdensburg | — |
| The Hunter School | — | Ogdensburg | — |
Get violation alerts for this daycare