DaycareLens
TexasPlano › Treehouse Day School

Treehouse Day School

Child care center · 600 DATA DR, Plano, TX 75075-7838 · License 1689142

0Compliance score
Poor

Capacity 94. InfantToddlerPre-KindergartenSchool

Violation history (56)

SeverityDateStandard / narrativeCorrected
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.4305 - Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
4 746.4805(b) - Measurement of Use Zone for Slides - Six Feet High or Less
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
4 746.4915 - Additional Surfacing Requirements for Indoor Active Play Equipment
The playground structure requires loose fill surfacing.
5 746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
The operation was inconsistent when explaining the details of an incident involving a child.
5 746.1003(1) - Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
4 746.3701 - Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
3 746.1309(e) - Documented Annual Training- Required Content
One staff member did not have the emergency preparedness training.

Severity 5 = most serious. Source: official state record.

Inspections (32)

32 inspection record(s) on file from TX-HHSC.

Nearby alternatives

FacilityScoreCityDistance
Plano Day Care Center 0 Plano
Heights Baptist Church Child Development 0 Richardson
First Baptist Church Child Development 0 Garland
Lewisville Christian School 0 Lewisville
First Baptist PreKindergarten 0 Richardson
La Petite 0 Plano

Licensed facilities near this one, highest compliance score first.

Get violation alerts for this daycare

We'll email you when a new inspection or violation is posted. Free.