Child care center ·
11450 LIBERTY SCHOOL RD, Azle, TX 76020-5550 ·
License 1784059- 4010
Capacity 50. Pre-KindergartenSchool
| Severity | Date | Standard / narrative | Corrected |
|---|
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 3 | — |
744.401(2) - Posting Requirements- Letter or form from the most recent licensing inspection or investigation. The most recent Licensing inspection was not posted at operation or available in a prominent and publicly accessible place. |
— |
| 4 | — |
744.3559(3) - Sheltering Drills for Lock-Down-4 times in a calendar year The operation failed to complete a Lock Down Drill during the past four months. |
— |
| 4 | — |
744.3559(2) - Sheltering Drill for Severe Weather- 4 times in a calendar year The operation failed to complete a Severe Weather Drill during the past four months. |
— |
| 4 | — |
744.303(4) - Report Change in Director The operation changed the Director and failed to notify Licensing within the mandated time frame. |
— |
| 3 | — |
744.3559(4) - Documentation of Drills The operation failed to document a fire drill for the month of November of 2025. |
— |
| 4 | — |
744.1005(a)(3) - Director Responsibilities - Employee Assignments The program director assigned a caregiver to a location without all required new hire training to be left alone with children. In addition, the caregiver was not provided a key to access the program's first aid kit and a list of the children in care. |
— |
| 4 | — |
744.1315(b) - Each caregiver, operation director, program director, and site director Pediatric CPR Sole caregiver at operation with 9 children in care did not have current CPR training available for review at time of inspection. Second caregiver arrived at operation approximately 15-20 minutes after children were in care. |
— |
| 4 | — |
744.1301(3)(A) - Training Requirements for Employees - Pediatric First Aid Sole caregiver of 9 children did not have current first aid training at time of inspection. |
— |
| 4 | — |
744.2669 - Food Allergy Plan-Emergency plan for diagnosed child, signed by health care professional and parent One child with a diagnosed food allergy in admission information does not have a food allergy plan available for review. |
— |
32 inspection record(s) on file from TX-HHSC.
Licensed facilities near this one, highest compliance score first.