Capacity 100. Pre-KindergartenSchool
Accepts subsidy
| Severity | Date | Standard / narrative | Corrected |
|---|
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
| 4 | — |
744.303(4) - Report Change in Director The operation did not inform licensing of a change in site director within the required timeframe. This was corrected during the inspection when licensing was informed of the change in site director. |
Yes |
8 inspection record(s) on file from TX-HHSC.
Licensed facilities near this one, highest compliance score first.