Capacity 16. ToddlerPre-Kindergarten
| Severity | Date | Standard / narrative | Corrected |
|---|
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 2 | — |
746.303(a)(1) - Report Change in Designee The operation did not notify Child Care Regulation within the required five days of the updated designee information. |
— |
| 4 | — |
746.5207(b) - Emergency Evacuation and Relocation Diagram - Posted in Each Room The emergency evacuation diagram was not posted in two classrooms. This was corrected at inspection when the director posted the emergency evacuation diagrams. |
Yes |
| 4 | — |
746.305(a)(7) - Report Change in Controlling Person The operation did not notify Child Care Regulation within the required two days when the listed controlling person ceased being a controlling person. |
— |