DaycareLens
Texas › Arlington › Shine Bright Christian Academy

Shine Bright Christian Academy

Child care center · 4201 LITTLE RD, Arlington, TX 76016-5602 · License 1824636

0Compliance score
Poor

Capacity 76. InfantToddlerPre-KindergartenSchool

Violation history (64)

SeverityDateStandard / narrativeCorrected
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The operation had loose fill in the amount of 3 inches on the playground when six is required.
—
5— 746.3701(9) - Safety - Bodies of Water Inaccessible to Children
During the application inspection, a water fountain is running near the front entrance.
Yes
5— 746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months
The facility did not have the fire inspection before today's application inspection.
—
3— 746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per Child
During the application inspection, the facility does not have infant/toddler outdoor playground.
—
3— 746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In Reach
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.
—
4— 746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.
—
5— 746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal Rules
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.
—
2— 746.303(b) - Report Number of Employees
The operation did not report the number of staff who ceased employment with them for 2025.
—

Severity 5 = most serious. Source: official state record.

Inspections (24)

24 inspection record(s) on file from TX-HHSC.

Nearby alternatives

FacilityScoreCityDistance
Park Row Christian Academy & Children's Center 0 Arlington—
Grace Lutheran Early Education 0 Arlington—
Fielder Road Baptist Early Childhood 0 Arlington—
Skyrise School on South Collins Street 0 Arlington—
New World Preschool 0 Arlington—
Woods Chapel Baptist Early Childhood ED 0 Arlington—

Licensed facilities near this one, highest compliance score first.

Get violation alerts for this daycare

We'll email you when a new inspection or violation is posted. Free.