Child care center ·
4500 ALLIANCE GATEWAY FWY, Fort Worth, TX 76177-3714 ·
License 548913- 810
Capacity 251. InfantToddlerPre-KindergartenSchool
Accepts subsidy
| Severity | Date | Standard / narrative | Corrected |
|---|
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 4 | — |
746.1301(7)(A) - Training Requirements for Employees, Caregivers, and Directors - Transportation Training Two staff were missing current transportation training. |
— |
| 5 | — |
746.1201(1) - Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control Based on the investigation findings, this standard was reviewed and found to be in non-compliance with The Minimum Standards for Child Care Centers. The caregiver did not demonstrate good judgment when they lifted a child up after the child dropped their weight back to the ground, The opposing forces between the child's weight and the caregiver's strength to pull the child up caused the child to receive nursemaid's elbow. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.1309(a) - Documented Annual Training Area - 24 Hours Required Four of the nine staff files reviewed did not have all 24 annual training hours as required. |
— |
| 3 | — |
746.1311(e) - Director Annual Training - Additional required topics The director was lacking two of the required training topics. |
— |
| 4 | — |
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less It was observed that 6 inches of loose fill surfacing is needed on the Pre school and School age playground. |
— |
| 3 | — |
746.901(2) - Required Personnel Records- Meets Requirements One of the ten staff records reviewed did not have a copy of the staff members high school diploma or equivelancy. |
— |
| 4 | — |
746.4751(c) - Maintenance Procedures for Active Play - Hazards Removed or Repaired It was observed that the metal fence between the pre school and school age playground were loose and broken on top. This posed a risk to children such as the loose metal part can poke in their eyes or tangle their clothes. |
— |
| 5 | — |
746.1205(a)(4) - Supervision ensures each child?s safety, well-being, including physical proximity and auditory or visual awareness of each child?s on going activity A child was left alone in a classroom after a caregiver transitioned the class for aproximately 2-3 minutes. The caregiver did not have auditory nor visual awareness. |
— |
| 4 | — |
746.201(9) - Complying with Laws and Rules This operation been cited for three times regarding lacking of loose surfacing on the pre school and school age playgrouon. The director requested the work-orders and send emails reminder to corporate office several times and as of today, 5/6/2026 - loose fill surfacing materials still hasn't delivered yet. |
— |
| 3 | — |
746.1309(e) - Documented Annual Training- Required Content Nine of nine staff files reviewed did not have two of the required training topics. |
— |
64 inspection record(s) on file from TX-HHSC.
Licensed facilities near this one, highest compliance score first.